The intent of the both of the projects is to provide design for the renovation of existing Hangars No 4 and 5, to include the construction of two separate blocks to house new maintenance shops and offices in order to meet the current requirements of the user and to install new hangar doors and tracks, new HVAC, new electrical distribution, fire alarm and LPS systems, new deluge fire suppression system. Necessary connections will be made to the existing fire water storage tank and transformer substation. All existing slab on grade surfaces, and exterior pavements that will be damaged during the construction works shall be repaired as required. For this purpose, all required Civil, Architectural, Mechanical, and Electrical Engineering services are conducted to accomplish the work. The whole design has been based on the requirements of latest UFC 4-211-01.
Design Completion Year : 2019
Client : Vectrus 39 CES/CECED