PROJECT NO. I

TITLE AND LOCATION:         CONSOLIDATED COMPOUND, KABUL / AFGHANISTAN

Work consists of the master planning, design and construction (Design-Build) of all facilities for the relocation of Kabul Consolidated Compound. It includes all site work, utilities, site improvements, storm drain system, roads, parking, walkways, compound lighting and upgrading entry control necessary for a fully functional compound.

Major features of work include the following areas Administrative Office Space (11.004 mē). General Administrative Space (4.402 mē), Billeting Space (6.774 mē) and a Dining Facility (1.190 mē).

The project also includes the construction of new utilities consisting of electric generators, generator fuel storage, water well, water storage, water treatment and distribution system, and waste water collection / treatment system and Road and Parking construction (bituminous surface).